3 inch pvc water fill plumbed into 3000 ga ,and 1500 ga. tanks. Ball valve to shut off smaller tank and backwater valve before spout to prevent water return.
Few things to button up, and a couple final boards to place once plumbing and electrical is finalized
Some progress photos of the tub deck, made from repurposed cedar .100% of the wood for this project was taken from a deconstructed structure elsewhere on the property.
Sanded, stained, and polished this old ice chest for a customers boat I was working on.
Charcuterie / Cutting board made from old cedar fence and surrounded by walnut. Hand-burned mandala by me
Had the pleasure of giving this log framed gazebo some love , so a wonderful couple in the neighborhood can enjoy it once again!